Before building a new house, the construction work should be started by making the whole budget so that the beautiful house can be built quickly

avatar of @imran17
25
@imran17
·
0 views
·
2 min read

It takes a lot of work to build a house, first an empty plot and then to fulfill your heart's desire and turn the world of your dreams into a reality like the house you saw. This is how a house is built to be built according to the plan. Today we will talk about a house in Bahria Town which was built by a good friend of mine and it took a lot of hard work and expense. I will also put it in front of you The structure of the house is ready but the work that remains to be done after that comes at a lot of cost and also takes time. It was also given a small park which was outside the yard of the house where children play because it is not possible to stay indoors all day long. This is also a part of this house The roof of this house will be in a dilapidated condition and lanterns have fallen on it. This house is located in Bahria Town Lahore and this house was mapped with a good computer designing and its name was Alibaba. He is a great cartographer who Makes maps of people's houses and then beautiful houses are built The stairs are used to go upstairs but the stairs will reach the third floor. A house up to two storeys is allotted in Bahria Town Lahore and the third floor is a part of the roof but the stairs are going there too. To beautify the stairs, tile stone work was done on them to enhance the beauty of the stairs. It also cost millions of rupees and this work was done by a good craftsman and this work took many days as it was small Work takes many days

How beautiful it always looks inside the ceiling is why global songs are sung which have different lights inside which run at night and create beauty inside the room. It is also installed at a cost of millions of rupees. As the land of this building was also 12.5 million and the house that was built on it cost 17 million rupees and then this house became beautiful.

The house building project was awarded to a private company which had already built a considerable number of houses. After that there was to be electrical work. It took a long time from the time of purchase of the plot to the time of residence in the house. The masons and laborers work and the electrician's labor and the rent of whatever material is imported from outside. All this is included in it. The cost of brick and stone tiles etc. is different. A lot of money was spent on beautifying the kitchen and beautifying the kitchen Along with the strategy of building a house, it should be done so that the house does not stop in the middle. The construction process continues and a good house is built