Posts

Sublime Sunday…..

avatar of @silverd510
25
@silverd510
·
0 views
·
1 min read

Afternoon everyone,

I’m taking my first break of the day and figured I’d get my post done. This has been a very challenging week, with the weather. The humidity level has not dropped below 85% a day this week.

So my deadline for install, can not get extended as I’m already overlapping jobs. Typically I can get two to three coats on per day depending on how big the job is. Well with this humidity, I’ve only been getting one full coat.

Not only that but I have to babysit the stuff I sprayed. Because the humidity can cause the finish to fog up and get hazy. This happens when moisture gets trapped under the finish.

No fun at all.

So what should’ve taken 2-2 1/2 days took 5. I’m spraying the final coat on the door and drawer front faces after this post.

I don’t have anything new to show but I have to share some shiny.